top of page

Elevation Views Studio

Remote Millwork Drawing and Design Service

About

Professional Remote Millwork Drawing and Design Service based in the Greater Toronto Area

Elevation Views Studio is dedicated to providing high-quality remote custom millwork drawing services for residential projects. With a strong foundation in interior design and residential construction, our team provides detailed, production-ready drawings tailored to meet the needs of contractors, cabinetry shops, and design professionals.

Our remote services are built on a collaborative, efficient process that ensures accuracy, speed, and clear communication. From 3D conceptual visuals to shop-ready 2D documentation, we help streamline your workflow and reduce back-and-forth during construction and manufacturing.​

EMXN1y8qSQoGdXBsb2FkEg55bGFiLXN0dW50LXNncBova2xpbmcvZG93bmxvYWQvTWpnNE1UUTJNekkwTlRNeE5qSX

Our Services

Flexible Drawing Packages Designed to Fit Your Workflow

Standard Drawing Package – $350.00CAD

Includes:

  • One preliminary Sketchup 3D and 2D drawings with measurements

  • One round of revision

  • Three 2D elevations

  • One 2D floor plan

  • Two 3D Sketch up view

Weekly plans available

In-Person Consultation – $600.00CAD (GTA)

Includes:

  • One hour on-site visit for measurement 

  • One hour Kitchen Manufacturer showroom visit to select materials and fixtures with client

  • The Standard Drawing Package

AutoCAD Package –$450.00CAD *Unavailable*

  • One AutoCAD 2D detailed shop drawing package

  • One round of revision

  • Three elevations

  • 1 floor plan

  • Up to three 2D sectional views

Add-ons

  • One Sketchup 2D elevation ($75.00)​

  • One Sketchup 3D view ($10.00)

  • Additional AutoCAD 2D elevation/floorplan ($75.00) *Unavailable*

  • Material and Fixture Sheet ($30.00)

  • Three 3D rendering view ($250.00)

  • One AutoCAD 2D sectional view ($30.00) *Unavailable*

Service Timeline

  • Preliminary drawing delivered on the selected booking date

  • A review period is included in the timeline to allow coordination with the homeowner and confirmation of site conditions.

  • Revisions completed within 48 hours of receiving revision notes and feedback

  • Timeline of 10-12 days from booking of service, assuming a prompt turnaround by kitchen manufacturer at every step

Portfolio

CONTACT US

bottom of page